Our Projects
From the Arctic to the Caribbean, we’re decarbonizing the construction industry, one build at a time. Explore our growing collection of projects that speak for themselves.
City of Albuquerque
SBMT Multigenerational Center | Albuquerque, New Mexico
Completed in under a year, this high-profile project underscores how advanced construction technologies can surpass traditional methods in speed, quality, and sustainability.
0
Onsite Waste
1
Facility built to last
Trico Communities
Shawnessy Station | Alberta, CA
70,000 sq ft of TechClad increased the energy efficiency of a 7-storey mixed-use development, resulting in almost $400,000 in savings.
2
Person Instal Crew
+ R9
Insulated R-value
Habitat for Humanity
Eureka Oaks Community Development | California, US
Calaveras Habitat for Humanity’s largest project to date will use ZS2’s TechBoard and TechPanels to build 43 condominiums, and 64 homes in a wildfire prone area.
107
Climate Resilient Homes
1 HR
Fire Rating
New Mexico United
Training Facility | New Mexico, USA
From initial design to occupation, this 2,400 sq. ft. training center used TechPanels for ease of construction and achieved completion in only 30 days.
2
Transport Trucks Total
5
Days Total for Roof and Wall Installation
Pine Grove Residence
Bahamas, BA
A ZS2 TechPartner project delivered by single shipping container to the Bahamas with TechPanel walls completed in less than four days.
2
Month Design to Installation
1
Shipping Container
Caywood Lane Development
Texas, US
Overcoming challenges posed by the state’s electrical grid and supply chain disruptions, this ZS2 TechPartner project exemplifies innovative construction for energy efficiency.
5
Multi Unit Development
4
Day Install
Lambing Barn
Alberta, CAN
Lambing barn transformed with adoption of MgO SIPS ensuring durability, and optimal warmth for newborns in harsh climate.
4
Day Install
50%
Energy Savings
Normandeau School Passive Green House
Alberta, CAN
A four season passive solar greenhouse equipped with thermal sensor integration into ZS2 TechPanels serving as a testament to exceptional envelope performance.
R40
Roof
0
Disposal Bins
Milk Processing Facility
Alberta, CAN
Commercial milk facility in Alberta, ensuring compliance, moisture resistance, and a quick two-day assembly during fall harvest.
2
Day Installation Time
0
Mold or Bacteria Growth
City of Albuquerque
SBMT Multigenerational Center | Albuquerque, New Mexico
Completed in under a year, this high-profile project underscores how advanced construction technologies can surpass traditional methods in speed, quality, and sustainability.
0
Onsite Waste
1
Facility built to last
Trico Communities
Shawnessy Station | Alberta, CA
70,000 sq ft of TechClad increased the energy efficiency of a 7-storey mixed-use development, resulting in almost $400,000 in savings.
2
Person Instal Crew
+ R9
Insulated R-value
New Mexico United
Training Facility | New Mexico, USA
From initial design to occupation, this 2,400 sq. ft. training center used TechPanels for ease of construction and achieved completion in only 30 days.
2
Transport Trucks Total
5
Days Total for Roof and Wall Installation
KHS Arctic Community Center
SAIT Green Building Technologies | Cambridge Bay, CAN
This cultural center serves an innovative approach to not only address the thermal challenges but also redefine the standards for arctic construction.
1
Icebreaker Ship Delivery
-40
Temperatures
Lambing Barn
Alberta, CAN
Lambing barn transformed with adoption of MgO SIPS ensuring durability, and optimal warmth for newborns in harsh climate.
4
Day Install
50%
Energy Savings
Normandeau School Passive Green House
Alberta, CAN
A four season passive solar greenhouse equipped with thermal sensor integration into ZS2 TechPanels serving as a testament to exceptional envelope performance.
R40
Roof
0
Disposal Bins
Trico Communities
Shawnessy Station | Alberta, CA
70,000 sq ft of TechClad increased the energy efficiency of a 7-storey mixed-use development, resulting in almost $400,000 in savings.
2
Person Instal Crew
+ R9
Insulated R-value
Habitat for Humanity
Eureka Oaks Community Development | California, US
Calaveras Habitat for Humanity’s largest project to date will use ZS2’s TechBoard and TechPanels to build 43 condominiums, and 64 homes in a wildfire prone area.
107
Climate Resilient Homes
1 HR
Fire Rating
Pine Grove Residence
Bahamas, BA
A ZS2 TechPartner project delivered by single shipping container to the Bahamas with TechPanel walls completed in less than four days.
2
Month Design to Installation
1
Shipping Container
Caywood Lane Development
Texas, US
Overcoming challenges posed by the state’s electrical grid and supply chain disruptions, this ZS2 TechPartner project exemplifies innovative construction for energy efficiency.
5
Multi Unit Development
4
Day Install
Trico Communities
Shawnessy Station | Alberta, CA
70,000 sq ft of TechClad increased the energy efficiency of a 7-storey mixed-use development, resulting in almost $400,000 in savings.
2
Person Instal Crew
+ R9
Insulated R-value
Milk Processing Facility
Alberta, CAN
Commercial milk facility in Alberta, ensuring compliance, moisture resistance, and a quick two-day assembly during fall harvest.