Skip links

Our Projects

From the Arctic to the Caribbean, we’re decarbonizing the construction industry, one build at a time. Explore our growing collection of projects that speak for themselves.

Luxury Lakeside Residence

3 Storey Fire-Resilient Residential Construction | Kelowna, British Columbia
Building for long-term performance on the shores of Okanagan Lake, a luxury Kelowna residence used ZS2 TechPanel® to deliver a fire-resilient, energy-efficient home designed for durability, moisture protection, and faster construction.

1

Climate-prepared envelope

1

Luxury architectural design​

Breath of Life Medford

Affordable Housing Community | Medford, Oregon, USA
Building in response to Southern Oregon’s wildfire risk, Promised Land, Inc. used ZS2 TechPanel® to deliver a 142-unit mixed-income community designed for fire resilience, energy efficiency, and faster construction.

1

Fire Smart Envelope

142

Community Units

Jasper Sunwapta Apartments

47-Unit Multi-Family Wildfire Rebuild | Jasper, Alberta
Rebuilding after the 2024 Jasper wildfires, High Rock used ZS2 TechPanel® to create a 47-unit apartment designed for fire resilience, faster construction, and long-term durability.

1

Fire Smart Envelope

4

Person Crew

Tataskweyak Transition Centre

Housing Facility | Split Lake, Manitoba
From –40°C construction to +800°C flames, this 9,766 sq ft residential project proves what prefabrication and magnesium cement can do. Delivered to a remote site, assembled in days, and tested by fire.

0

Damage

1

Wild Fire

City of Albuquerque

SBMT Multigenerational Center | Albuquerque, New Mexico
Completed in under a year, this high-profile project underscores how advanced construction technologies can surpass traditional methods in speed, quality, and sustainability.

0

Onsite Waste

1

Facility built to last

Shawnessy Station built with ZS2 Technologies mateirals

Trico Communities

Shawnessy Station | Alberta, CA
70,000 sq ft of TechClad increased the energy efficiency of a 7-storey mixed-use development, resulting in almost $400,000 in savings.

2

Person Install Crew

+ R9

Insulated R-value

Commercial Training Facility - New Mexico | ZS2 Technologies

New Mexico United

Training Facility | New Mexico, USA
From initial design to occupation, this 2,400 sq. ft. training center used TechPanels for ease of construction and achieved completion in only 30 days.

2

Transport Trucks Total

5

Days Total for Roof and Wall Installation

Pine Grove Residence

Bahamas, BA
A ZS2 TechPartner project delivered by single shipping container to the Bahamas with TechPanel walls completed in less than four days.

2

Month Design to Installation

1

Shipping Container

Caywood Lane Development

Texas, US
Overcoming challenges posed by the state’s electrical grid and supply chain disruptions, this ZS2 TechPartner project exemplifies innovative construction for energy efficiency.

5

Multi Unit Development

4

Day Install

Jasper Sunwapta Apartments

47-Unit Multi-Family Wildfire Rebuild | Jasper, Alberta
Rebuilding after the 2024 Jasper wildfires, High Rock used ZS2 TechPanel® to create a 47-unit apartment designed for fire resilience, faster construction, and long-term durability.

1

Fire Smart Envelope

4

Person Crew

City of Albuquerque

SBMT Multigenerational Center | Albuquerque, New Mexico
Completed in under a year, this high-profile project underscores how advanced construction technologies can surpass traditional methods in speed, quality, and sustainability.

0

Onsite Waste

1

Facility built to last

Shawnessy Station built with ZS2 Technologies mateirals

Trico Communities

Shawnessy Station | Alberta, CA
70,000 sq ft of TechClad increased the energy efficiency of a 7-storey mixed-use development, resulting in almost $400,000 in savings.

2

Person Install Crew

+ R9

Insulated R-value

Commercial Training Facility - New Mexico | ZS2 Technologies

New Mexico United

Training Facility | New Mexico, USA
From initial design to occupation, this 2,400 sq. ft. training center used TechPanels for ease of construction and achieved completion in only 30 days.

2

Transport Trucks Total

5

Days Total for Roof and Wall Installation

KHS Arctic Community Center

SAIT Green Building Technologies | Cambridge Bay, CAN
This cultural center serves an innovative approach to not only address the thermal challenges but also redefine the standards for arctic construction.

1

Icebreaker Ship Delivery

-40

Temperatures

Lambing Barn

Alberta, CAN
Lambing barn transformed with adoption of MgO SIPS ensuring durability, and optimal warmth for newborns in harsh climate.

4

Day Install

50%

Energy Savings

Normandeau School Passive Green House

Alberta, CAN
A four season passive solar greenhouse equipped with thermal sensor integration into ZS2 TechPanels serving as a testament to exceptional envelope performance.

R40

Roof

0

Disposal Bins

Luxury Lakeside Residence

3 Storey Fire-Resilient Residential Construction | Kelowna, British Columbia
Building for long-term performance on the shores of Okanagan Lake, a luxury Kelowna residence used ZS2 TechPanel® to deliver a fire-resilient, energy-efficient home designed for durability, moisture protection, and faster construction.

1

Climate-prepared envelope

1

Luxury architectural design​

Breath of Life Medford

Affordable Housing Community | Medford, Oregon, USA
Building in response to Southern Oregon’s wildfire risk, Promised Land, Inc. used ZS2 TechPanel® to deliver a 142-unit mixed-income community designed for fire resilience, energy efficiency, and faster construction.

1

Fire Smart Envelope

142

Community Units

Tataskweyak Transition Centre

Housing Facility | Split Lake, Manitoba
From –40°C construction to +800°C flames, this 9,766 sq ft residential project proves what prefabrication and magnesium cement can do. Delivered to a remote site, assembled in days, and tested by fire.

0

Damage

1

Wild Fire

Shawnessy Station built with ZS2 Technologies mateirals

Trico Communities

Shawnessy Station | Alberta, CA
70,000 sq ft of TechClad increased the energy efficiency of a 7-storey mixed-use development, resulting in almost $400,000 in savings.

2

Person Install Crew

+ R9

Insulated R-value

Pine Grove Residence

Bahamas, BA
A ZS2 TechPartner project delivered by single shipping container to the Bahamas with TechPanel walls completed in less than four days.

2

Month Design to Installation

1

Shipping Container

Caywood Lane Development

Texas, US
Overcoming challenges posed by the state’s electrical grid and supply chain disruptions, this ZS2 TechPartner project exemplifies innovative construction for energy efficiency.

5

Multi Unit Development

4

Day Install

Shawnessy Station built with ZS2 Technologies mateirals

Trico Communities

Shawnessy Station | Alberta, CA
70,000 sq ft of TechClad increased the energy efficiency of a 7-storey mixed-use development, resulting in almost $400,000 in savings.

2

Person Install Crew

+ R9

Insulated R-value

Milk Processing Facility

Alberta, CAN
Commercial milk facility in Alberta, ensuring compliance, moisture resistance, and a quick two-day assembly during fall harvest.

2

Day Installation Time

0

Mold or Bacteria Growth

This website uses cookies to improve your web experience.